National Focus

Danang international airport ready for expansion

By Quynh Chi November 09, 2018 | 10:34 AM GMT+7

More than 13.7 hectares of remediated land at the Danang international airport has just been handed over to the control of the Ministry of Transportation.

The hand over of more than 13.7 hectares of remediated land at the Danang International Airport.

This is the third and last portion of land to be turned over for expansion of this airport. 

This event also marked the completion of the six-year, $110 million project on the environmental remediation of dioxin contamination at Danang airport, jointly implemented by the United States Agency for International Development (USAID) and Ministry of National Defense (MND).

Launched in August 2012, USAID’s project on environmental remediation of dioxin contamination at Danang airport has successfully treated over 90,000 cubic meters of contaminated soil and sediment through thermal desorption and safely contained an additional 50,000 cubic meters of low concentration, dioxin-contaminated material. 

USAID and MND tested the treated soil and sediment to determine if the cleanup objective of 150 parts per trillion (ppt) was achieved. Phase 1 treated soil was less than 9 ppt and Phase 2 even lower (<1 ppt), exceeding all project goals.

"Our successful efforts with Vietnam's Air Defense-Air Force Command have resulted in over 30 hectares of additional land for expansion of Danang international airport, which will drive regional economic growth", said USAID/Vietnam Mission Director Michael Greene.

According to US Ambassador to Vietnam Daniel J. Kritenbrink, Bien Hoa (Dongnai province) would be the next destination as the Bien Hoa airbase area is the largest remaining hotspot of dioxin contamination in Vietnam. 

On May 11, USAID signed a grant with Vietnam's Air Defense-Air Force Command for a total expected contribution of $183 million towards remediation activities in the Bien Hoa airbase area over an initial five-year period. The signing of this joint project document is the first step in this important initiative.

Noi Bai airport to increase capacity up to 100 million passengers annually

Noi Bai airport to increase capacity up to 100 million passengers annually

National Focus -  5 year
The Ministry of Transport has been assigned to study the plan on expanding and adjusting the planning of Noi Bai international airport to solve its current overload.
Noi Bai airport to increase capacity up to 100 million passengers annually

Noi Bai airport to increase capacity up to 100 million passengers annually

National Focus -  5 year
The Ministry of Transport has been assigned to study the plan on expanding and adjusting the planning of Noi Bai international airport to solve its current overload.
Women leading the charge in Vietnam's green transition

Women leading the charge in Vietnam's green transition

National Focus -  1 day

Acting for increased women’s participation and leadership in climate action, Vietnam can accelerate a transition that is more inclusive, just, and impactful.

Steam for girls: A journey of passionate and creative girls

Steam for girls: A journey of passionate and creative girls

National Focus -  3 week

The "Steam for girls 2024" competition provides a creative platform for Steam and an opportunity for students to connect with peers from various regions within Vietnam and internationally.

Politburo backs North-South high-speed railway proposal

Politburo backs North-South high-speed railway proposal

National Focus -  1 month

The Politburo on Wednesday supported a plan to invest in a high-speed railway along the country’s North-South axis, marking a crucial step for the multi-billion-dollar project aimed at boosting economic growth and infrastructure development.

Ho Chi Minh City inaugurates Japan-funded wastewater treatment plant

Ho Chi Minh City inaugurates Japan-funded wastewater treatment plant

National Focus -  1 month

Ho Chi Minh City has inaugurated the expanded Binh Hung wastewater treatment plant, now the largest facility of its kind in Vietnam.

Electric vehicle market faces growth hurdles

Electric vehicle market faces growth hurdles

National Focus -  1 month

Vietnam's electric vehicle market, holding just 15 per cent of the automotive market share, shows promise but faces significant challenges in scaling up due to infrastructure and regulatory obstacles.

Vietnam halves registration fees for locally produced cars

Vietnam halves registration fees for locally produced cars

National Focus -  1 month

The reduction aims to boost consumer spending for three months.